Potrebujeme váš súhlas na využitie jednotlivých dát, aby sa vám okrem iného mohli ukazovať informácie týkajúce sa vašich záujmov. Súhlas udelíte kliknutím na tlačidlo „OK“.
Terms of works on design, building and reconstruction of substations and power transmission lines of 35-1150 kV
Norma vydaná dňa 1.6.2012
Vybraný formát:consolidated index of the cost of construction of transmission lines and substations of the voltage 35-1150 kV
Norma vydaná dňa 9.7.2012
Vybraný formát:Standard order of organization and execution of metrological maintenance of information-and-measuring systems in OJSC "FSK EES"
Norma vydaná dňa 20.8.2012
Vybraný formát:Standard order of organization and execution of verification (calibration) of measuring current transformers (CT), voltage transformers (VT) on the places of their operation in OJSC "FSK EES"
Norma vydaná dňa 30.8.2012
Vybraný formát:Methodical instructions on development and enforcement of the norms of time periods for verification, calibration, and control of integrity of measuring apparatuses in OJSC "FSK EES"
Norma vydaná dňa 21.9.2012
Vybraný formát:Standards for equipping with vehicles, special mechanisms and tractors for maintenance and repair of the objects of Federal grid company
Norma vydaná dňa 24.10.2012
Vybraný formát:Insulation of electrical installations in the areas with polluted atmosphere. Operation and maintenance
Norma vydaná dňa 29.10.2012
Vybraný formát:Electric equipment for voltage over 3 kV. Methods of testing external insulation in polluted condition
Norma vydaná dňa 29.3.2013
Vybraný formát:Complete block transformer substations. Typical technical requirements
Norma vydaná dňa 11.3.2014
Vybraný formát:Schematic circuit diagrams of switchgears of substations of 35-750 kV. Patterns
Norma vydaná dňa 20.12.2007
Vybraný formát:Zobrazený záznam od 200 až 210 z celkom 358 záznamov.
Posledná aktualizácia: 2026-06-10 (Počet položiek: 2 281 917)
© Copyright 2026 NORMSERVIS s.r.o.