Potrebujeme váš súhlas na využitie jednotlivých dát, aby sa vám okrem iného mohli ukazovať informácie týkajúce sa vašich záujmov. Súhlas udelíte kliknutím na tlačidlo „OK“.
Automatic warning of track maintenance gangs
Automaticky preložený názov:
Automatické upozornenie na trati gangov na údržbu
NORMA vydaná dňa 1.6.2002
Označenie normy: UIC 730-3-3ed.
Dátum vydania normy: 1.6.2002
Kód tovaru: NS-550380
Počet strán: 33
Približná hmotnosť: 99 g (0.22 libier)
Krajina: Medzinárodná technická norma
Kategória: Technické normy UIC
Summary:
The goal of the leaflet is to specify the requirements for an automatic warning system.
Such a system aims at:
automatic warning of approaching rail vehicles in adequate time, with a high degree of safety, for staff working on or near tracks,
reduction of the staff needed for track-gang warning.
The leaflet is based on Report, Part 1, of the ORE1 A 124 Specialists Committee.
The system consists in an announcement part and a warning part, so designed that each part can operate separately.
The system is specified for operation till 200 km/h.
It is based on a radio transmission in the 160 MHz and 460 MHz frequency ranges.
A system based on the GSM-R frequency range is out of the scope of the present leaflet.
The leaflet is specified in a very detailed way. It includes:
Operating conditions:
for the complete warning system, detector, announcement transmitter, warning centre - including announcement receiver and warning transmitter, warning receiver, warning signal generator,
Safety and reliability requirements,
Technical requirements - including environment and design:
for the complete warning system, detector, announcement transmitter, cables for the announcement transmission line and warning transmission line, centre - including announcement receiver and warning
transmitter, warning receiver with acoustic warning signal, warning receiver with optical warning signals, acoustic warning signal generator, optical warning signal generator and continuous warning
light.
Concepts, definitions, block diagram and warning signal are given in Appendix A.
1.
ORE became ERRI (European Rail Research Institute) in January 1992.
Posledná aktualizácia: 2024-07-29 (Počet položiek: 2 339 192)
© Copyright 2024 NORMSERVIS s.r.o.