Potrebujeme váš súhlas na využitie jednotlivých dát, aby sa vám okrem iného mohli ukazovať informácie týkajúce sa vašich záujmov. Súhlas udelíte kliknutím na tlačidlo „OK“.
Požadavky na paralelně připojené výrobny s distribučními sítěmi - Část 1: Připojení k distribuční síti nn - Výrobny do typu B včetně (Norma k přímému použití jako ČSN).
NORMA vydaná dňa 1.8.2019
Označenie normy: ČSN EN 50549-1
Rozlišovací znak: 330127
Katalógové číslo: 507394
Dátum vydania normy: 1.8.2019
Kód tovaru: NS-955208
Počet strán: 80
Približná hmotnosť: 240 g (0.53 libier)
Krajina: Česká technická norma
Kategória: Technické normy ČSN
This document specifies the technical requirements for the protection functions and the operational capabilities for generating plants, intended to operate in parallel with LV distribution networks.
For practical reasons this document refers to the responsible party where requirements have to be defined by an actor other than the DSO e.g. TSO, member state, regulatory authorities according to the legal framework. Typically the DSO will inform the producer about these requirements.
The requirements of this European Standard apply, irrespective of the kind of energy source and irrespective of the presence of loads in the producer´s network, to generating plants, generating modules, electrical machinery and electronic equipment that meet all of the following conditions:
If generating modules of different type (A or B) are combined in one plant, different requirements apply for the different modules based on the type of each module.
Unless specified otherwise by the DSO and the responsible party, generating plants connected to a medium voltage distribution network with a maximum apparent power up to 150 kVA can comply with this European Standard as alternative to the requirements of EN 50549 2. A different threshold may be defined by the DSO and the responsible party.
This document recognizes the existence of specific technical requirements (e.g. grid codes) of the DSO or another responsible party within a member state and these must be complied with.
Excluded from the scope are the selection and evaluation of the point of connection; power system impact assessment e.g. assessment of effects on power quality, local voltage increase, impact on line protections operation; connection assessment, the set of technical verifications made as part of the planning of the connection; island operation of generating plants, both intentional and unintentional, where no part of the distribution network is involved; four-quadrant rectifier of drives feeding breaking energy back into the distribution network for limited duration with no internal source of primary energy; uninterruptible power supply with duration of parallel operation limited to 100 ms; requirements for the safety of personnel as they are already adequately covered by existing European Standards and the connection of a generating unit, module or plant into a DC networ
Zmena vydaná dňa 1.7.2024
Vybraný formát:
Chcete mať istotu, že používate len platné technické normy?
Ponúkame Vám riešenie, ktoré Vám zaistí mesačný prehľad o aktuálnosti noriem, ktoré používate.
Chcete vedieť viac informácií ? Pozrite sa na túto stránku.
Posledná aktualizácia: 2024-11-08 (Počet položiek: 2 210 012)
© Copyright 2024 NORMSERVIS s.r.o.