Potrebujeme váš súhlas na využitie jednotlivých dát, aby sa vám okrem iného mohli ukazovať informácie týkajúce sa vašich záujmov. Súhlas udelíte kliknutím na tlačidlo „OK“.
Standard Practice for Assessment of Attaining Clean Up Level for Site Closure (Withdrawn 2016)
Automaticky preložený názov:
Štandardná prax pre hodnotenie dosiahnutie upratať úroveň pre Site Uzavretie
NORMA vydaná dňa 1.12.2010
Označenie normy: ASTM D6597-10
Poznámka: NEPLATNÁ
Dátum vydania normy: 1.12.2010
Kód tovaru: NS-35807
Počet strán: 4
Približná hmotnosť: 12 g (0.03 libier)
Krajina: Americká technická norma
Kategória: Technické normy ASTM
Keywords:
clean, closure, decontaminate, impoundment, site, soils, tank, waste, Environmental site assessment (ESA), Impoundment, Waste materials/processing/analysis, Assessment/Assesors--environmental applications, Clean soil, Closure (of environmental facilities), Decontamination, Environmental monitoring, ICS Number Code 13.030.40 (Installations and equipment for waste disposal and treatment)
Significance and Use | ||||||||||||||||||||||||||||||||||||||||
This practice contains a mechanism to determine that the hazardous constituents have been remediated to an acceptable level. This practice assists both the regulator and the owner/operator in establishing cost-effective steps and procedures necessary to determine if the site has achieved its objective for site closure. This practice can be applied to hazardous and nonhazardous spills or leaks, surface impoundments, waste piles, buildings, and tanks. The general nature of this practice allows its use in a large variety of situations. |
||||||||||||||||||||||||||||||||||||||||
1. Scope | ||||||||||||||||||||||||||||||||||||||||
1.1 This practice covers the steps necessary to determine if a site is ready for closure with emphasis on general sampling techniques and how to determine if the agreed upon level of remediation has been achieved. 1.2 A minimum of statistical procedures is used in this practice. 1.3 The standard practice does not address radioactive waste sites nor does it cover every situation that can occur in the field. It does cover the following general sampling techniques: soil sampling, swipe sampling of buildings and equipment, surface impoundments, waste piles, and layered tanks. It does not cover drum sampling, general water sampling and monitoring wells and their construction. 1.4 The values stated in inch-pound units are to be regarded as standard. the values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. 1.5 This standard does not purport to address all safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices to determine the applicability of regulatory limitations prior to use. |
||||||||||||||||||||||||||||||||||||||||
2. Referenced Documents | ||||||||||||||||||||||||||||||||||||||||
|
Chcete mať istotu, že používate len platné technické normy?
Ponúkame Vám riešenie, ktoré Vám zaistí mesačný prehľad o aktuálnosti noriem, ktoré používate.
Chcete vedieť viac informácií ? Pozrite sa na túto stránku.
Posledná aktualizácia: 2024-12-23 (Počet položiek: 2 217 157)
© Copyright 2024 NORMSERVIS s.r.o.