Norma API BULL 75L-ed.1 1.1.2013 náhľad

API BULL 75L-ed.1

Guidance Document for the Development of a Safety and Environmental Management System for Onshore Oil and Natural Gas Production Operations and Associated Activities



NORMA vydaná dňa 1.1.2013


Jazyk
Prevedenie
DostupnosťSKLADOM
Cena46.30 bez DPH
46.30

Informácie o norme:

Označenie normy: API BULL 75L-ed.1
Dátum vydania normy: 1.1.2013
Kód tovaru: NS-1139435
Počet strán: 24
Približná hmotnosť: 72 g (0.16 libier)
Krajina: Americká technická norma
Kategória: Technické normy API

Anotácia textu normy API BULL 75L-ed.1 :

API BULL 75L, 1st Edition, November 2007 - Guidance Document for the Development of a Safety and Environmental Management System for Onshore Oil and Natural Gas Production Operations and Associated Activities

Objective and Scope

An effective SEMS will have a fundamental objective of promoting continuous progress towards making safety and environmental protection an integral part of the companys culture. A SEMS should address facilities, engineering design, major equipment, and work processes relevant to the appropriate owners, contractors, or suppliers. This publication provides guidance for any company in the business of onshore oil and natural gas production, including drilling, construction, well servicing, and maintenance activities. In addition to having an effective SEMS, responsible development includes being a good neighbor and being committed to environmental protection and compliance with all applicable federal, state, and local regulations. Annex B provides guidance for a company to consider as a "good neighbor."

Purpose

This publication is designed to aid companies in initiating the development of a SEMS. The intent is to identify a series of tools to assist in the development and implementation, or improvement, of the system. The design of each companys system will be unique and its implementation schedule tailored to leverage the existing system at a pace realistic to the company and its business plan. For those beginning the process of implementing a SEMS, it is recommended that the process be implemented over time on a risk basis, evolving into a complete system that addresses appropriate SEMS elements specific to a companys operations. Both design and schedule should initially address higher risk facilities, equipment, and processes; following that, the system should continue to expand to address risk in phases, addressing the more important elements at first and expanding to the full system over time. Simply stated, the SEMS can be implemented in several phases on various levels (i.e. geographically, functional areas, system elements). This phase-in schedule should be documented in the planning of the system.

Odporúčame:

Aktualizácia technických noriem

Chcete mať istotu, že používate len platné technické normy?
Ponúkame Vám riešenie, ktoré Vám zaistí mesačný prehľad o aktuálnosti noriem, ktoré používate.

Chcete vedieť viac informácií ? Pozrite sa na túto stránku.




Cookies Cookies

Potrebujeme váš súhlas na využitie jednotlivých dát, aby sa vám okrem iného mohli ukazovať informácie týkajúce sa vašich záujmov. Súhlas udelíte kliknutím na tlačidlo „OK“.

Súhlas môžete odmietnuť tu.

Tu máte možnosť prispôsobiť si nastavenia súborov cookies v súlade s vlastnými preferenciami.

Potrebujeme váš súhlas na využitie jednotlivých dát, aby sa vám okrem iného mohli ukazovať informácie týkajúce sa vašich záujmov.