Potrebujeme váš súhlas na využitie jednotlivých dát, aby sa vám okrem iného mohli ukazovať informácie týkajúce sa vašich záujmov. Súhlas udelíte kliknutím na tlačidlo „OK“.
Standard Practice for Least Cost (Life Cycle) Analysis of Concrete Culvert, Storm Sewer, and Sanitary Sewer Systems
Automaticky preložený názov:
Štandardné praktiky pre najmenších náklady ( životného cyklu ) analýza konkrétnych culvert , dažďovej kanalizácie a sanitárne kanalizáciách
NORMA vydaná dňa 15.10.2015
Označenie normy: ASTM C1131-10(2015)
Poznámka: NEPLATNÁ
Dátum vydania normy: 15.10.2015
Kód tovaru: NS-619046
Počet strán: 6
Približná hmotnosť: 18 g (0.04 libier)
Krajina: Americká technická norma
Kategória: Technické normy ASTM
Keywords:
acceptance criteria, concrete, costs, culvert, inflation rate, interest rate, least cost analysis, life cycle analysis, pipe, procedures, project design life, sanitary sewer, service life, storm sewer,, ICS Number Code 91.140.80 (Drainage systems)
Significance and Use | ||
3.1 The significance of the LCA method is that it is a comprehensive technique for taking into account all relevant monetary values over the project design life and provides a measure of the total cost of the material, system, or structure. 3.2 The LCA method can be effectively applied in both the preconstruction and bid stages of projects. After bids are taken, real costs can be used instead of estimates. |
||
1. Scope | ||
1.1 This practice covers procedures for least cost (life cycle) analysis (LCA) of materials, systems, or structures proposed for use in the construction of concrete culvert, storm sewer, and sanitary sewer systems. Note 1: As intended in this practice, examples of analyses
include, but are not limited to the following: (1) materials-pipe linings and coatings,
concrete wall thicknesses, cements, additives, etc.; (2) systems-circular pipe, box sections,
multiple lines, force mains, etc.; and (3) structures-wet and dry wells, pump and
lift stations, etc.
1.2 The LCA method includes costs associated with planning, engineering, construction (bid price), maintenance, rehabilitation, replacement, and cost deductions for any residual value at the end of the proposed project design life. 1.3 For each material, system, or structure, the LCA method determines in present value constant dollars, the total of all initial and future costs over the project design life, and deducts any residual value. 1.4 Major factors in the LCA method include project design life, service life, and relevant interest and inflation rates. |
||
2. Referenced Documents | ||
|
Chcete mať istotu o platnosti využívaných predpisov?
Ponúkame Vám riešenie, aby ste mohli používať stále platné (aktuálne) legislatívne predpisy
Chcete vedieť viac informácií ? Pozrite sa na túto stránku.
Posledná aktualizácia: 2024-05-07 (Počet položiek: 2 897 585)
© Copyright 2024 NORMSERVIS s.r.o.